GDV Utilities
Grid Hardening

Wildfire mitigation
& grid hardening.

GDV Utilities supplies IBEW line crews for utility wildfire mitigation and grid hardening work: covered conductor, pole replacements, equipment change-outs and undergrounding, in California and nationwide.

Work typesCovered conductor, pole replacement, equipment change-outs, undergrounding
ClientsUtilities and prime contractors
WhereHigh fire-threat areas in CA, AZ and NV, plus hardening programs nationwide
Labor & licensesIBEW crews · Licensed in CA, AZ, NV
Scope

What we do

Crews and equipment scaled to the job, from a single crew to multi-crew programs.

Covered conductor

Reconductoring bare wire with covered conductor, including framing changes.

Pole replacement

Upgrading poles to steel, composite or wrapped wood to resist fire and wind.

Equipment change-outs

Replacing fuses, cutouts, arresters and connectors with fire-safer equipment.

Undergrounding

Trench, conduit, vaults and cable to move lines underground in high-risk areas.

Inspections and repairs

Ground and climbing inspections and follow-up repairs in high fire-threat districts.

Storm hardening

Pole, crossarm and guy upgrades for hurricane and storm hardening programs.

Built for program work

Crews that fit your plan

Wildfire mitigation and hardening programs need steady, qualified crews that can work to the utility's standards and produce. Our crews are typically four or five people with a Foreman, Journeyman Linemen, an Equipment Operator and a Groundman or Apprentice, with bucket trucks and digger derricks. See Qualified Line Crews.

In California, utility wildfire mitigation plans drive large amounts of covered conductor, pole replacement and undergrounding work. Outside California, storm hardening programs, like Florida's grid hardening work, use much of the same crew and equipment. See Florida storm restoration.

In the field

Our crews at work

GDV Utilities lineman working from a bucket truck on an energized line
Bucket work on a distribution line
GDV Utilities crew setting a new wood distribution pole with a digger derrick
Setting a new distribution pole
Multiple GDV Utilities overhead line crews working together
Multi-crew overhead work
Why GDV Utilities

Built by line people

GDV Utilities is led by people who came up in the trade and know what it takes to run safe, productive crews in the field.

IBEW union crews

Signatory to the Outside Line Construction Agreement, with IBEW-trained Foremen, Linemen, Operators and Groundmen.

Safety first

Daily tailboards, stop work authority and work practices aligned with Cal/OSHA High Voltage Electrical Safety Orders and GO 95 & 128.

Built for overhead work

Bucket trucks and digger derricks for setting poles and framing, with pole and wire trailers to keep material on site.

Licensed in 3 states

CA Lic. A & C-10 #1163710 · AZ Lic. A & C-11 ROC #345427 · NV Lic. C-2 #0093534.

Utility experience

Our crews have worked on utility systems across the country, including:

SCE logo
PG&E logo
SDG&E logo
LADWP logo
SMUD logo
IID logo
SFPUC logo
Riverside Public Utilities logo
Anaheim Public Utilities logo
Burbank Water & Power logo
Glendale Water & Power logo
Pasadena Water & Power logoPasadena Water & Power
Roseville Electric logo
Alameda Municipal Power logo
Redding Electric Utility logo
City of Shasta Lake logo
APS logo
SRP logo
NV Energy logoNV Energy
AEP logo
Entergy logo
Oncor logo
CenterPoint Energy logo
Southern Company logo
Georgia Power logo
Gulf Coast Electric Cooperative logo
Duke Energy logo
Dominion Energy logo
TVA logo
FPL logo
PPL logo
Exelon logo
PECO logoPECO
BGE logoBGE
Atlantic City Electric logoAtlantic City Electric
FirstEnergy logo
JCP&L logo
PSE&G logo
NYSEG logo
Con Edison logo
O&R logoO&R
National Grid logo
Eversource logo
United Illuminating logo
Unitil logo
New Hampshire Electric Co-op logo
DTE logo
Consumers Energy logo
MidAmerican Energy logo
OG&E logo

…and most utility systems across the U.S.

FAQ

Common questions

Do you do covered conductor work?

Yes. Our crews reconductor bare lines with covered conductor and make the framing changes the design calls for.

Do you work for prime contractors on hardening programs?

Yes. We supply crews and take subcontract scopes from prime contractors on utility hardening and wildfire mitigation programs.

Can you work in high fire-threat districts?

Yes. We work in high fire-threat areas and follow the utility's fire prevention requirements on site.

Do you do grid hardening outside California?

Yes. Our crews work across the country, including storm hardening programs in the Southeast.

Contact

Need a crew?

Tell us about your project or storm call-out and we'll respond quickly. For the fastest response, give us a call.