What affects the price
Panel size
A 100A temporary panel costs less than a 200A panel. The right size depends on what will run on site at the same time.
Site access and ground conditions
Our crews set the pole with a digger derrick. Tight access, slopes, rock or other difficult digging conditions take more time and equipment.
Where the utility places the pole
The utility planner decides the location. The distance and route to the utility's service point affect the installation.
Permit fees (priced separately)
Electrical permit fees are set by each city or county building department and vary by jurisdiction. They are not included in our quote. Permit fees are priced separately after the job is signed.
Utility requirements
Each utility has its own requirements for temporary service, and those can change the equipment and work needed at your site.
Location
Remote sites farther from our crews can add travel time.
What is included in our quote
- Utility temporary service request
- Pole, meter base and 100A or 200A temporary panel, installed
- Inspection coordination
- Removal when your permanent service is on, with a rental or purchase option
Not included: Permit fees are priced separately after the job is signed. We still pull the permit for you.
The utility's own meter installation and energization are scheduled by the utility.
Why we quote every job
Because utility requirements and site conditions differ on every job, a flat online price would either be wrong or padded. We give you a firm quote for your site instead. Send the job address and a photo of the entire property showing the nearest utility pole(s), and we will get back to you within one business day.
What if my project runs long?
That is not a problem. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project. A rental fits shorter jobs, and buying can make more sense for long builds.