GDV Utilities pulls, splices and terminates feeder cable, builds duct bank and vaults, and connects Phoenix-area data center campuses to APS and SRP, with union crews that self-perform the work.
From the utility tie-in to the last termination, for general contractors, electrical contractors, developers and utilities.
Medium-voltage feeder cable pulled from large reels on heavy-duty reel rollers, with pull planning and cable handling to protect the cable.
Primary splices, elbows and terminations by IBEW Cable Splicers.
Trenching, duct bank, conduit placement and backfill between the utility, substation and buildings.
Setting and working in vaults, manholes and pull boxes, with confined space procedures.
Setting and connecting pad-mount transformers and switchgear.
Overhead and underground line extensions and tie-ins, coordinated with the serving utility.
Potholing and daylighting to locate existing utilities before boring or excavation.
Temporary power poles and panels to power the site during construction.
24/7 crews when weather or damage threatens power to a live campus.
Arizona license ROC #345427 (A General Engineering & C-11 Electrical)
The Phoenix metro is one of the fastest-growing data center markets in the country, with campuses across the West Valley, Mesa and Chandler. Most sites are served by APS or SRP, and every campus needs medium-voltage feeders, duct bank and a utility interconnection.
Our crews have worked on APS and SRP systems and know their construction standards, which helps when the utility inspects or takes ownership of the work. Summer heat in the Valley shapes the schedule. We plan cable pulls and civil work around heat-illness prevention and early start times.
Feeder cable pulls, vault work and confined space entry on a recent data center campus.




Licensed in California, Arizona and Nevada, home to some of the fastest-growing data center markets in the West.
IBEW Local 47 and 1245 signatory, so our crews fit union project labor agreements.
Civil, cable and line work by our own crews, with fewer handoffs on your schedule.
Crews that know utility standards, which helps when the utility inspects or takes ownership.
California, Arizona and Nevada, the markets where data center campuses are growing.
Upload drawings, specs or an RFP and tell us what you need. We reply within one business day.
Prefer to talk? Call (951) 317-6134 or email wwatson@gdvutilities.net
Yes. GDV Utilities self-performs feeder cable pulls, splicing and terminations, duct bank, vaults and utility interconnection for data center campuses in the Phoenix area, served by APS and SRP.
Yes. We work as a subcontractor to general contractors, electrical contractors and developers, as well as directly for the utilities that serve data center campuses.
Yes. Our crews set up and pull from large reels on heavy-duty reel rollers, then splice and terminate the cable.
Yes. We trench, install duct bank and conduit, set vaults and manholes, and pothole existing utilities with vacuum excavation before digging.
Yes. GDV Utilities is signatory to IBEW Local 47 and Local 1245 under the Outside Line Construction Agreement.
Yes. We install temporary power poles and coordinate the temporary service with the serving utility while the campus is built.
We are licensed in California, Arizona and Nevada.
Talk to Will Watson, VP of Power Line Construction, about your feeder, civil and utility scope.