GDV Utilities
Altadena, CA · Los Angeles County

Temporary power poles
in Altadena.

GDV Utilities installs temporary power poles for new homes, ADUs, remodels and commercial sites in Altadena, and upgrades panels for solar and EV chargers. We pull the permit, handle the SCE service request and meet the inspector.

Serving utilitySCE
Temp panel sizes100A or 200A
Turnaround3–5 business days after permit and utility approval
LicensedCalifornia license A & C-10 #1163710
Altadena temporary power

How it works in Altadena

One call covers the permit, the utility, installation, inspection and removal.

1. Permit

We pull the electrical permit with Los Angeles County Public Works Building & Safety (Altadena is unincorporated) and schedule the inspection.

2. Utility service request

Southern California Edison (SCE) serves Altadena, while neighboring Pasadena runs its own utility. We submit the request, and the SCE planner sets the pole location.

3. Install, inspect, energize

We set and wire the pole with a 100A or 200A panel, meet the inspector, and the utility sets the meter and energizes.

Local note: Most Altadena work right now is Eaton Fire rebuild. Altadena is unincorporated, so LA County issues the permit, not the City of Pasadena, and SCE handles temporary service through its fire rebuild process. We plan the pole around cleared lots, grading and new trenching. See our fire rebuild resources for SCE and LA County rebuild links.
Panel & service upgrades

Solar & EV panel upgrades in Altadena

Main panel and service upgrades sized for solar, battery storage and EV chargers, including trenching.

Load review

We check your existing panel and service against your solar, battery or EV plans and size the upgrade correctly.

Panel and service upgrade

New main panel or meter main, service conductors and trenching for underground runs and charger feeds.

Utility coordination

We schedule the disconnect and reconnect with SCE and handle the paperwork start to finish.

Neighborhoods

Where we work in and around Altadena

Plus nearby communities across Los Angeles County.

West AltadenaEast AltadenaCentral AltadenaUpper AltadenaKinneloa MesaEaton CanyonChristmas Tree LanePasadenaLa Cañada FlintridgeSierra Madre
FAQ

Altadena temporary power questions

Which utility serves my job site in Altadena?

Southern California Edison (SCE) serves Altadena, while neighboring Pasadena runs its own utility. We confirm the serving utility for your address before we quote.

Who pulls the permit for a temporary power pole in Altadena?

We do. GDV Utilities pulls the electrical permit with Los Angeles County Public Works Building & Safety (Altadena is unincorporated), submits the utility service request and meets the inspector. Permit fees are priced separately after the job is signed.

How fast can you install a temporary power pole?

Typically 3 to 5 business days after the permit is issued and the utility approves the service location. The utility schedules the meter set and energization.

What size temporary panel do I need?

Most single-family homes and ADUs use a 100A or 200A temporary panel. We size it to your tools, trailers and site loads when we quote.

Can I rent or buy the temporary power pole?

Both. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project.

Do you do solar and EV panel upgrades in Altadena?

Yes. We upgrade main panels and services for solar, batteries and EV chargers, including trenching, and coordinate the disconnect and reconnect with SCE. GDV Utilities holds California license A & C-10 #1163710.

Contact

Need power on a Altadena job?

Send the job address and a photo showing the nearest utility pole. We reply within one business day.