GDV Utilities
Orange, CA · Orange County

Temporary power poles
in Orange.

GDV Utilities installs temporary power poles for new homes, ADUs, remodels and commercial sites in Orange, and upgrades panels for solar and EV chargers. We pull the permit, handle the SCE service request and meet the inspector.

Serving utilitySCE
Temp panel sizes100A or 200A
Turnaround3–5 business days after permit and utility approval
LicensedCalifornia license A & C-10 #1163710
Orange temporary power

How it works in Orange

One call covers the permit, the utility, installation, inspection and removal.

1. Permit

We pull the electrical permit with the City of Orange Building Division (or OC Public Works for unincorporated areas like Orange Park Acres) and schedule the inspection.

2. Utility service request

Southern California Edison (SCE) serves the City of Orange. We submit the request, and the SCE planner sets the pole location.

3. Install, inspect, energize

We set and wire the pole with a 100A or 200A panel, meet the inspector, and the utility sets the meter and energizes.

Local note: Orange builds range from historic Old Towne remodels to custom homes on larger lots in Orange Park Acres and the hills. We plan the pole around mature trees, long driveways and derrick access.
Panel & service upgrades

Solar & EV panel upgrades in Orange

Main panel and service upgrades sized for solar, battery storage and EV chargers, including trenching.

Load review

We check your existing panel and service against your solar, battery or EV plans and size the upgrade correctly.

Panel and service upgrade

New main panel or meter main, service conductors and trenching for underground runs and charger feeds.

Utility coordination

We schedule the disconnect and reconnect with SCE and handle the paperwork start to finish.

Neighborhoods

Where we work in and around Orange

Plus nearby communities across Orange County.

Old Towne OrangeOrange Park AcresSantiago HillsOrange HillsEl ModenaVilla ParkAnaheim HillsTustinSanta AnaNorth Tustin
FAQ

Orange temporary power questions

Which utility serves my job site in Orange?

Southern California Edison (SCE) serves the City of Orange. We confirm the serving utility for your address before we quote.

Who pulls the permit for a temporary power pole in Orange?

We do. GDV Utilities pulls the electrical permit with the City of Orange Building Division (or OC Public Works for unincorporated areas like Orange Park Acres), submits the utility service request and meets the inspector. Permit fees are priced separately after the job is signed.

How fast can you install a temporary power pole?

Typically 3 to 5 business days after the permit is issued and the utility approves the service location. The utility schedules the meter set and energization.

What size temporary panel do I need?

Most single-family homes and ADUs use a 100A or 200A temporary panel. We size it to your tools, trailers and site loads when we quote.

Can I rent or buy the temporary power pole?

Both. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project.

Do you do solar and EV panel upgrades in Orange?

Yes. We upgrade main panels and services for solar, batteries and EV chargers, including trenching, and coordinate the disconnect and reconnect with SCE. GDV Utilities holds California license A & C-10 #1163710.

Contact

Need power on a Orange job?

Send the job address and a photo showing the nearest utility pole. We reply within one business day.