GDV Utilities
Riverside, CA · Riverside County

Temporary power poles
in Riverside.

GDV Utilities installs temporary power poles for new homes, ADUs, remodels and commercial sites in Riverside, and upgrades panels for solar and EV chargers. We pull the permit, handle the RPU or SCE service request and meet the inspector.

Serving utilityRiverside Public Utilities, SCE
Temp panel sizes100A or 200A
Turnaround3–5 business days after permit and utility approval
LicensedCalifornia license A & C-10 #1163710
Riverside temporary power

How it works in Riverside

One call covers the permit, the utility, installation, inspection and removal.

1. Permit

We pull the electrical permit with the City of Riverside Building & Safety Division (or Riverside County Building & Safety for unincorporated addresses) and schedule the inspection.

2. Utility service request

Most of the City of Riverside is served by Riverside Public Utilities (RPU), the city-owned electric utility, while unincorporated areas around the city, such as Woodcrest and parts of Highgrove, are served by SCE. We submit the request, and the utility planner sets the pole location.

3. Install, inspect, energize

We set and wire the pole with a 100A or 200A panel, meet the inspector, and the utility sets the meter and energizes.

Local note: Because Riverside runs its own utility, the temporary service request, pole location and meter set go through RPU instead of SCE inside city limits. We confirm the serving utility for your address before we quote, so the job is set up with the right utility from day one.
Panel & service upgrades

Solar & EV panel upgrades in Riverside

Main panel and service upgrades sized for solar, battery storage and EV chargers, including trenching.

Load review

We check your existing panel and service against your solar, battery or EV plans and size the upgrade correctly.

Panel and service upgrade

New main panel or meter main, service conductors and trenching for underground runs and charger feeds.

Utility coordination

We schedule the disconnect and reconnect with RPU or SCE and handle the paperwork start to finish.

Neighborhoods

Where we work in Riverside

Plus the rest of Riverside and nearby communities in Riverside County.

DowntownArlingtonLa SierraCanyon CrestOrangecrestMission GroveMagnolia CenterWood StreetsUniversityWoodcrest
FAQ

Riverside temporary power questions

Which utility serves my job site in Riverside?

Most of the City of Riverside is served by Riverside Public Utilities (RPU), the city-owned electric utility, while unincorporated areas around the city, such as Woodcrest and parts of Highgrove, are served by SCE. We confirm the serving utility for your address before we quote.

Who pulls the permit for a temporary power pole in Riverside?

We do. GDV Utilities pulls the electrical permit with the City of Riverside Building & Safety Division (or Riverside County Building & Safety for unincorporated addresses), submits the utility service request and meets the inspector. Permit fees are priced separately after the job is signed.

How fast can you install a temporary power pole?

Typically 3 to 5 business days after the permit is issued and the utility approves the service location. The utility schedules the meter set and energization.

What size temporary panel do I need?

Most single-family homes and ADUs use a 100A or 200A temporary panel. We size it to your tools, trailers and site loads when we quote.

Is removal included?

Yes. We remove the pole once your permanent service is on. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project.

Do you do solar and EV panel upgrades in Riverside?

Yes. We upgrade main panels and services for solar, batteries and EV chargers, including trenching, and coordinate the disconnect and reconnect with RPU or SCE. GDV Utilities holds California license A & C-10 #1163710.

Contact

Need power on a Riverside job?

Send the job address and a photo showing the nearest utility pole. We reply within one business day.