GDV Utilities
Free download · 2 pages

Temp power checklist
permit to energize.

The six steps from permit to energized temporary power, the documents to have ready, which utility serves your lot, and the delays that cost builders weeks. Free, for builders and owner-builders in California, Arizona and Nevada.

What’s inside

Get the checklist

  • ✓What to have ready before you request power
  • ✓The six steps, permit to meter set
  • ✓Who serves your lot: SCE, LADWP, SDG&E, IID, PG&E, APS, SRP, NV Energy
  • ✓The most common delays, and how to avoid them
  • ✓Job-site rules while the pole is up

Need power now? Get a temp power quote or call (951) 317-6134.