The quick answer
- 100 amps: one home, an ADU or a remodel, with hand tools, saws, compressors, chargers and work lights.
- 200 amps: larger homes, several trades working at the same time, welders, electric heaters or drying equipment, or a site office with air conditioning.
- 400 amps: multi-unit and commercial sites with heavy equipment.
Get a temporary power quote for 100A or 200A and we will help you size it.
Which size fits which job
| Panel | Typical job | Typical loads |
|---|---|---|
| 100A | Single-family home, ADU, remodel | Circular and miter saws, drills, a compressor, battery chargers, work lights |
| 200A | Larger homes, fast schedules with several trades, fire rebuilds | Everything above, plus welders, electric heaters, drying fans, a site office or trailer |
| 400A | Multi-unit and commercial construction | Multiple trailers, heavy welding, large heaters, hoists |
Signs you need the bigger panel
- Two or more trades will run heavy tools at the same time.
- The site will use electric heat, curing blankets or dehumidifiers in winter.
- Someone will weld on site.
- There will be a job trailer or office with heating or air conditioning.
- The schedule is tight, and tripped breakers would cost a crew hours.
What happens if you choose too small
An undersized panel trips breakers and slows crews down. Upsizing mid-project usually means a new permit, a new inspection and sometimes a new utility request, so it is cheaper to choose right the first time. If you are between sizes, choose 200 amps.
The utility can also limit what it will serve: LADWP's standard temporary service process covers single-phase service up to 400 amps, with 200 amps as its typical example. See the permit guide and rent or buy.